July 26, 2013 The reporter learned from the website of the Standing Committee of the Beijing Municipal People’s Congress that the fifth meeting of the Standing Committee of the 14th National People’s Congress of Beijing heard the explanation of the Municipal Government on the Regulations of Beijing Municipality on Prevention and Control of Atmospheric Pollution (Draft) . The Beijing Municipal People's Congress City Construction and Environment Protection Committee proposed in its deliberations that in order to improve Beijing’s air quality, Beijing Municipality plans to provide that the construction site’s construction site dusting violations be included in the city’s construction enterprise market behavior credit evaluation system; , Dregs, gravel, earth, mortar and other bulk, fluid materials, vehicle installation satellite positioning system , to eliminate the road left.

The report pointed out that the construction project site dust is the chronic disease of the city's air pollution, to solve this problem, Beijing from the first half of this year, require the construction site should install video surveillance systems. The "Beijing Clean Air Action Plan (2011-2015 Air Pollution Control Measures)" stipulates that construction dust violations should be incorporated into the construction enterprise credit management system as an important basis for bidding. These effective management measures should be solidified.

It is proposed to amend Article 58(5) of the “Regulations (Draft)” to read: “Flushing vehicle facilities shall be set up at the exit of the construction site of the construction project, and a video monitoring system shall be installed in accordance with the regulations of this Municipality. After being driven out of the site, mud shall not be allowed to run on the road. Drainage and mud sedimentation facilities shall be installed in the vehicle cleaning department."

It is proposed to add a paragraph as the second paragraph in Article 58 of the “Regulations (Draft)”: “This Municipality incorporates the construction site’s dust pollution violations at the construction site into the city’s market behavior credit evaluation system.”

In addition, in order to further strengthen the supervision and management of construction waste transportation vehicles and prevent them from being thrown out of order, the transport vehicles should be required to install a satellite positioning system so as to prevent road spillage.

It is suggested that Article 60 of the Regulations (Draft) be amended to read: “Transportation of bulk and fluid materials such as garbage, muck, gravel, earthwork, and grout shall use vehicles with transportation documents issued by the municipal administrative department of city appearance. , Installation of satellite positioning system, closed transport."

Neodymium Ring Magnets

Ring Magnets,Neodymium Ring Magnets,Neodymium Magnets Tube Shaped,Strong Neodymium Ring Magnets

Anfeng Industrial Co.,Ltd , https://www.afmagnets.com