2. Before driving, first drive the car. After no abnormal noise, open the blower air supply, and then open the flotation machine from the last slot of the process to prevent the flotation machine from overloading or pressing. 3. In the production, according to the selection requirements, adjust the appropriate liquid level, and maintain the required level of the ore surface through the liquid level control device or the electric discharge gate. 4. The amount of inflation can be adjusted by the intake valve according to the nature of different ores and the requirements of different sorting operations. 5. During operation, it is necessary to check the temperature of the motor and the bearing. It is necessary to fill the lubrication point regularly (7 days) to maintain the normal operation and civilized production of the equipment. 6. According to the work indicators, combined with the color and shape of the class foam, determine the nature of the ore and control the amount of foam scraping. If there is any change, the agent should be adjusted in time. 7. Before parking, stop in the order of medicine → scraper → flotation machine. It is strictly forbidden to pull down the main gate and stop continuously. 8. When parking, it is necessary to wait for the mine to stop completely and add water to the slurry for 30 minutes. First stop the flotation machine from the first slot of the process and then stop the blower. 9, parking does not have to mine, can keep the full tank slurry better, in order to facilitate the next drive; when the pulp is placed, to meet the needs of the submerged pump, can not put more, so as not to be too much hygiene, resulting in water waste. 10. Check the wear condition of the impeller cover and the wear of the over-slurry and regulating pipe valves after shutdown. 11. After the machine is stopped, according to the daily maintenance and maintenance contents, check the tightening and lubrication parts of the equipment, add the butter to the upper and lower bearings of the flotation machine, adjust the belt, and check the scraper bushing. 12. Check the dosage of the medicine every half hour, and measure the PH value every hour and record. 13. Keep the roads smooth and smooth during operation, easy to walk, no garbage, and the tools are placed at fixed locations. 14. At any time, cooperate with the maintenance of the fitter to repair and maintain the screw of the flotation machine, spindle inspection, belt tensioning, etc. 15. Clean up before work, check equipment, record work and operation, and explain to the successor. Refers to outdoor lighting other than road lighting. Outdoor lighting is required to meet outdoor visual work needs and achieve decorative effects. Led High Bay ,Led Floodlight,Led Street Light,Outdoor Lighting Guangzhou ZG Scaffolding.co.Ltd , https://www.zgscaffolding.com
1. Take over the inspection of the operation of each section, the adjustment of the medicine and whether the belt, guard, platform and guardrail are in good condition, whether there is leakage, leakage, water leakage or air leakage.