01. How much higher will the room height be after laying the ground?

The floor heating system can be designed for different floor materials, such as solid wood flooring: insulation layer and floor heating pipe are laid under the keel under the wooden floor. It is recommended to use floor tiles and stone from the effect: the backfill layer can be combined with the laying of floor tiles and stone. The occupancy of the room height can be reduced to 2 to 4 cm. For the owner of the purchase of commercial housing (generally, the floor height is more than 2.8m), it is not necessary to consider the occupancy of the floor heating system for the height of the room. Just consider the orientation of the different rooms and the grounding materials to be selected for the function. Zhuoyuan Comfort will give Your professional design offers maximum comfort.

02. What stage of floor heating is more suitable, and the construction period is a few days?

Floor heating can be carried out after the completion of the hydropower transformation process, or in combination with water renovation and strong and weak electrical system transformation. The simple control of the flat house of about 120?, the floor heating construction period is 2 to 3 days, and the backfilling period will vary according to the season. For the hop type with higher control system, the construction period needs one week. Left and right, the backfilling period will vary depending on the season. In addition, the laying of the floor heating system should pay great attention to avoid the destruction of the buried pipe by subsequent renovation.

03. Install the floor radiant heating, what decorative materials can the ground choose?

Nowadays, all kinds of qualified solid wood flooring, solid wood composite flooring, laminate flooring, stone, ceramic tile, cement brick, rubber floor and floor leather can be used for floor heating. Only the thermal conductivity of different flooring materials is different. Users should tell us the decorative materials to be selected before making the floor heating, so that we can consider them in the calculation of heat load.

04. What kind of floor decoration material is good for floor heating?

For this problem, Zhuoyuan comfort home can only objectively explain the difference in thermal efficiency caused by the difference in thermal conductivity of various decorative materials, that is, the higher the thermal efficiency, the lower the running cost. The thermal conductivity of the floor materials is arranged in descending order: natural stone > tile > solid wood laminate flooring > laminate flooring > solid wood flooring > chemical fiber carpet > pure wool carpet. Therefore, the smaller the thermal conductivity, the higher the operating cost to achieve the same heating effect.

05. What should I pay attention to when choosing various floors for floor heating?

In general, we should grasp the principle of “should be thin, not suitable for environmental protection, and good heat resistance”. Zhuoyuan Comfort Home recommends that customers choose products with brand and strong manufacturers when choosing floor coverings. It is best to choose floor heating. In addition, there is another problem to be paid attention to when installing the floor heating special floor is the floor mat. It is necessary to use the geothermal special paper mat, which has the characteristics of fast heat conduction and no deformation. Do not use ordinary foam floor mats. The foam mats are slow in heat conduction, and they are prone to produce harmful gases under the action of high temperature for a long time, which is harmful to consumers' health.

06. What are the precautions before the construction of floor heating?

1. The construction of the floor radiant heating system should avoid cross-construction work with other types of work, resulting in difficulties in coordination or unclear responsibilities, and the construction quality is difficult to guarantee. Users need to let us communicate with the decoration company in advance and coordinate the work coordination process.

2. The hydropower transformation should be completed before the construction of the floor heating system enters the site. Before the installation of the floor heating system, the construction of the water and electricity pipelines on the construction site should be completed. The kitchen and the bathroom should be tested for water shutoff and accepted. The ground in the construction area is level and clean. There are no exposed steel bars, water and electricity pipelines and any equipment that affects the construction. Materials, sundries, etc.

3. When the decoration company is doing backfilling in the later stage, it should pay attention to it, minimizing the possibility of damage to the floor heating during construction.

4. The owner should assist us in coordinating the relationship with the property company and the neighbors, and create conditions for normal construction, including responsible for handling the corresponding personnel and equipment access permits, commencement and acceptance procedures for the property and other relevant departments.