The company disclosed that in 2016, LED small-pitch TV entered the industry outbreak period, and the shortage of raw materials in the third quarter was alleviated. As of the end of November 2016, the new orders exceeded 1.6 billion yuan; meanwhile, with Nanchang, Wuhan, Maotai, Chifeng, The rise of cities such as Shangrao and the demonstration effect caused by the G20, the night travel economy became the announcement of the city Liard on the evening of December 9, the company expects 2016 profit of 629 million yuan 695 million yuan, an increase of 90% 110%. The company disclosed that in 2016, LED small-pitch TV entered the industry outbreak period, and the shortage of raw materials in the third quarter was alleviated. As of the end of November 2016, the new orders exceeded 1.6 billion yuan; meanwhile, with Nanchang, Wuhan, Maotai, Chifeng, The rise of urban lighting such as Shangrao and the demonstration effect caused by the G20, the night travel economy has become an important project in urban cultural construction, which has led to the brightening of LED city landscape into a high growth period. The company's LED lighting business segment has significantly increased its performance; In 2016, the operating income can achieve and exceed the target of 4 billion yuan, and the net profit for the period can be greatly increased.

Cabinet Hardware

This classification principally includes the aluminum or zinc alloy die casting Machinery Parts using in Cabinet area.
In the die casting process,higher specific pressure is required, so that higher filling speed can be achieved,which is useful for alloy to overcome mold filling resistance.and effectively fill each part of the cavity.The Casting General Tolerance is Grade GB-CT4.
Process Technology: High pressure die casting,Shot Blasting,NC Machining,Spray Coating
Product Dimensions: Customized
Casting General Tolerance: Grade GB-CT4
Flow Processes: Die casting, Degating to remove the residual of the gate, Polishing,Deburring,Polishing to remove the parting line, flash,CNC Turning, Cleaning, Packaging, Storaging, Shipping
Control Measure: Incoming Material Test, First Article inspection, Routing inspection, Final item inspection, and Outgoing quality control
Inspection Equipment: CMM, Caliper, Plug Gage, Screw Gauge
Application: Cabinet
Certificate: IATF16949:2016,ISO14001:2015,ISO45001:2018
Lead Time: 30-35 days
Trade Term: FOB Ningbo

Aluminum Die Casting Cabinet Hardware Part,Aluminum Casting Part for Cabinet,Zinc Die Casting Cabinet Hardware Components

NINGBO ZHENHAI BOLANG METAL PRODUCTS FACTORY , https://www.bolangautoparts.com