Jinchangyu Gold ore dressing plant belonging treated quartz veins containing a small amount of pyrite ore, gold ore grade 4 ~ 6 grams / ton, using flotation - concentrate cyanide - zinc replacement process, concentrate containing gold 115 ~ 130 grams / ton.

1. Zinc wire replacement production practice    The precious liquid is initially purified by a sand filter box, and after removing some of the slime, it is pumped into the precious liquid pool and clarified in the pool. The clarified liquid is fed to the displacement tank and reacts with the zinc wire in the tank. Technical operating conditions and technical indicators:

Liquid flow:                  180 meters 3 / day;

CN - concentration:                                     0.05 ~ 0.06% ;

CaO concentration:                                         0.03% ;

Zinc wire consumption:                                     240 grams / m 3 ;

Lean liquid contains gold:                             0.1 5 ~ 0 .20 g / m 3 ;

Replacement rate:                  99. 0 ~ 99.5% .

Thickness of zinc wire 0.2 mm ,width 2 mm Containing 0.1% lead. In the production, zinc wire is added to each shift, and the replacement cycle is one month. The extracted gold mud is manually washed and filtered by a vacuum filter, and the filter cake contains about 30% water.

2. Zinc powder replacement production practice    Purification uses a plate and frame vacuum filter. Vacuum deoxidation tower for deoxidation, specification ф 1000 × 3500 mm, equipped with ZBA-60 hydraulic jet pump vacuum device. The replacement machine uses a BMT 20 / 035 × 25 plate and frame filter press. Operating technical conditions and technical indicators:

CN - concentration in the noble liquid:      0.04 ~ 0.05% ;

CaO concentration:            0.02 ~ 0.03% ;

Pb ) (Ac) 2 concentration:                  0.0032% ;

Suspension concentration:         10 ~ 20 grams / m 3 ;

Vacuum degree :              700 to 720 mm · Hg;

Oxygen content of deoxidizing solution:                  Less than 0.25 g / m 3 ;

Zinc powder dosage:                       80 grams / m 3 ;

Noble flow:                      200 ~ 220 m3 ;

Your liquid contains gold:           10 ~ 18 g / m 3 ;

Replacement rate:             99.87 ~ 99.90% ;

Gold mud gold grade:                     15 to 20% .

3. Comparison of economic indicators of zinc powder and zinc wire replacement technology    Comparing the technical and economic indicators of the above two zinc replacement methods, the replacement rate of the zinc powder method is higher than that of the zinc wire method; the production is low; and the amount of zinc powder replacement gold mud is small, the fire smelting cost is low.

High accuracy, full penetration welded, sealed construction with three parts welded can be used for in marine project, is able to float.

For example, cooperating and connecting with other marine structures (vessel, box anchor...)

Photo of our Floating Pipe:

Floating Pipe


Construction

The construction is to be built according to the drawing with rules of good workmanship.

All the welding seams are waterproof.  

Materials

All fabricated steelwork used in the construction of the pipe line will be to manufacturing standard of UniSite or other classification society.

All materials proposed will be selected to comply with the latest Health and Safety Rules.

Paint systems for hull protection will be of the highest quality (Hempel, Inter, Sigma, Jotun)

Welding

All welding will be performed in accordance with drawing and standard and UniSite experience and all welding will be continuous and full penetration.

Main particulars

 

MAIN PARTICULARS

Tolerance

High accuracy(ISO2768, ISO5817, ISO13920)

Material

Q195-Q345, S235JR-S355J2G3 or other materials

Technique

All the welding seams are waterproof.  

Dimension(L*B*H)

As per drawing

Out diameter

1000-3000mm

Wall thickness

18-30mm

Weight

10Ton-30Ton

Standard

AISI, ASTM, BS, DIN, GB, JIS

Special capacity

Floating, Connection

Surface

Sa2.5 blasted and two or three layers painted with highest quality

Marking

as per clients' requirements

Inspection

material, construction, dimension, welding seam, non defective test, paint inspection

Others

Recyclable, in line with environmental requirements and standards, and reliable

 

Our service

Besides above the general specifications, we can also supply some specific floating pipes and other similar steel structure as clients' requirements.

 

Package and shipping

bulk package and bulk vessel transportation

container package and container transportation



Floating Pipe

Floating Dredging Pipe,Floating Dredge Pipe,Floating Pipe Line,Steel Floating Pipe