YLW series coal/biomass Thermal Oil Boiler adopts Square coil horizontal structure,chain grate automatic fuel feeding, FD/ID fan mechanical ventilation,slag remover for mechanical slag removing Coal Thermal Oil Boiler,Automatic Coal Fired Thermal Oil Boiler,Industrial Coal Fired Thermal Oil Boiler,Coal Fuel Thermal Oil Boiler,Thermal Oil Boiler Coal Fired Henan Yuanda Boiler Co., Ltd. , https://www.industrysboiler.com
On the afternoon of December 2, 2011, the fifth meeting of the fifth meeting of the Shenzhen Institute of Instrumentation was held in the International Conference Hall of Shenzhen University. The meeting was presided over by Shao Hong, the Secretary-General of the Society, and the first meeting was held in 2011 of Shenzhen Instrument Society. We have fully affirmed the results of the Society's work and proposed the future work direction and goals of the City Science Association. The Society's secretariat reported to the Council on the 2012 Academy's key activities plan and the Institute's work proposal. After full discussion, the meeting unanimously adopted the 2012 key activities plan and other relevant documents. The conference attracted more than 30 industry experts, engineers, college teachers and students (instrumentation and control students from Shenzhen University) and news media and other professionals from Shenzhen and surrounding areas, Hong Kong instrumentation industry. Leaders of Rao Luhua, director of Xu Yunzhong, and other academic leaders also attended the meeting.
while running,the burning fuel enter into the chain grate through the fuel hopper,then burn,The high-temperature flue gas is reflected to the front of the furnace by the rear arch and enters the furnace chamber. After radiation heat transfer by the radiation heating surface, it enters the convection heating surface for convection heat transfer.then enter into waste heat recovery boiler/air pre-heater, dust catcher, ID fan ,finally discharged into air by chimney
products features:
1. Multi-loop coil design
2. Countercurrent heat transfer process
3. Over oil temperature/over smoke temperature/low flow alarm
4. Set up air preheater, waste heat boiler
5. New "α" furnace arch
6. Advanced and scientific fabric technology
In the afternoon of December 2, 2011, the fifth meeting of the 5th board meeting of the Shenzhen Institute of Instrumentation was held in the International Conference Hall of Shenzhen University. The meeting was chaired by Shao Hong, deputy editor-in-chief of the Society. The first meeting was with the Society of Instrument and Meters of Shenzhen. In 2011, the work of the Society was fully affirmed, and the future direction and goals of the City Association for Science and Technology were proposed.