-
Model NO.: AF-H312
-
Machine Color: as Require
-
Machine Weight: 6tons
-
Cutting Type: Hydraulic
-
Usage: Guardrail
-
Size of Container: 40gp
-
Transport Package: Normal
-
Origin: Shanghai
-
Name: Highway Guardrail Roll Forming Machine
-
Machine Size: 10.5m*1.4m*1.4m
-
Control System: PLC
-
Driven Type: Chain
-
Life Long: 10years
-
Trademark: Aofa
-
Specification: AF-H315
-
HS Code: 84552210
312 WÂ Beam 18.5kw Two Waves Crash Barrier Roll Forming MachineHighway guardrail roll forming machine, highway guardrail forming machine
Roll forming machine, guardrail forming machine, three waves guardrail forming machine, two waves guardrail forming machine
Working flow:Uncoiler--- feeding-------flatting ------- punching------ forming --- cutting---finsihed product
Technical description:1. Decoiler:1)Capacity 5T/10T,
2)Type: Manual or electirc hydraulic type
3)Inner diaemter: 508-600mm
4)Outdiameter: 1200mm
2. Leveling device:
1)Rollers: 7rollers,
2)roll shaft Φ 123× 600mm
3)Material: Cra2 steel after treatment
3. Punching and Cutting unit:1)essure: 15T, 20-25 MPa
2)wer: Ydraulic station power: 11KW
3)Type: Hyfruluc cutting after pumching
4. Forming Machine1)Power: 7.5kw
2)Forming stand: 16steps
3) Shaft: Diameter Φ 90mm
4)Shaft material: High grade No. 45 steel after treatment
5)Roller material: 45# steel polished and coated with chrome HRC55-60°
6) Forming speed: About 10M/min
7) Transmission: Gear transmission, main power 45KW, JZQ650 retarder
8) Voltage: 380V 3phase 50Hz
5. Control systemType: PLC Frequency Control System with touch screen
PLC Brand: Japan Panasonic
Encoder Brand: Omron
Length Error: ± 2mm
Â
Machine components |
No. Â |
Name  |
Qty  |
1. Â |
De-coiler  |
1 Set  |
2. Â |
Feeding and Guiding Device  |
1 Set  |
3. Â |
Roll Forming Machine  |
1 Set  |
4. Â |
Punching device  |
1 Set  |
5. Â |
Hydraulic Cutting Device  |
1 Set  |
6. Â |
PLC Control Box  |
1 Set  |
7. Â |
Output table  |
1 Set  |
Service
Terms |
Payment type |
35% T/T prepaid and balance should be paid before loading |
Delivery time |
30days after receving advance payment |
Guarantee period |
18monthes free service/ pay service all the machine life |
Installation and training |
If buyers visit our factory and check the machine,  we will teach you how to install and use the machine,  and also train your workers/technician face to face. Without visiting, we will send you user manual and video to teach you to install and operate. If buyer needs our technician to go to your local factory, please arrange board and lodging and other necessary things. |
MACHINE PHOTOS Packing and loading photos Contact:Abby Song MOB/+86-18701854523TEL: +86-21-67298619 Website:http://shaofa.en.alibaba.com        http://www.shafjx.comÂ
Outdoor Trampoline
Outdoor Trampoline,No Spring Trampoline,Underground Trampoline,Trampoline Outdoor
Jiangsu Baoxiang Sports Equipment Co., Ltd , https://www.skyboundup.com